Significant Additional Information Submitted 31st August 2026
SIGNED RFI Response Cover Letter 31 Aug 2026
RFI Response Document_ACP
Attachment 1.1 27th April 2016 Cork Theoretical Model for R1 Calculations for Various Scenarios
Attachment 2.1 Indaver_EIS_Ch10_NoiseVibration
Attachment 2.2 Appendix 10.1 Baseline Noise Monitoring
Attachment 2.3 Figure 10.1
Attachment 3.1 Indaver_EIS_Ch9_Climate
Attachment 4.1 Indaver_EIS_Ch15_MatAssets
Attachment 5.1 Indaver_EIS_Ch8_AirQuality
Attachment 5.2 Appendix 8.1_Air Quality Study
Attachment 5.3 Appendix 8.2 Description of AERMOD Model
Attachment 5.4 Appendix 8.4 Cumulative Impact Assessment
Attachment 5.5 Appendix 8.5 Sensitivity Assessment of Modelling Input Parameters
Attachment 5.6 Appendix 8.10 Air Modelling Assessment – Stack Height of 114.25m
Attachment 5.7 Appendix 8.11 Air Modelling Validation Study Using Roches Point Meteorological Station
Attachment 5.8 Appendix_8.12_Odour Impact Assessment
Attachment 5.9 Appendix_8.13_Comparison Of Predicted Emissions Profile With Existing WTE Facilities In Ireland
Attachment 6.1 Appendix 8.9 PFAS Modelling Assessment
Attachment 7.1 Chapter 13 Soils, Geology, Hydrogeology, Hydrology and Coastal Recession
Attachment 7.2 Appendix 13.3 Coastal Erosion Study
Attachment 7.3 Figures 13.19a-13.19b
Attachment 7.4 Figure 13.26